Lane closures slated for Victoria Street Bridge

By City of Trail

Lane closures slated for Victoria Street Bridge

The traffic lanes and pedestrian walkway on the eastbound (downstream) side of the Victoria Street Bridge will be closed from Monday, Feb. 15 to Monday, Feb. 29. The closure will accommodate crews from Power Tech Electrical Ltd. who will be installing LED lights as part of the Victoria Street Bridge Lighting Project. The westbound (upstream) side of the bridge will be open for single-lane two-way traffic and pedestrians.

During this time, crews and traffic control personnel will be onsite Monday-Friday, from 7am - 5pm. Motorists traveling across the bridge outside these hours are asked to take caution and obey the posted construction signage.

We thank you for your patience and cooperation. Please direct any questions or concerns to the City’s Engineering Department at 250-364-0807.

Thank you
City of Trail

Previous
Previous

Job is far from over as Cotter edges Geall to advance into final of 2016 Canadian Direct Insurance BC Men’s Curling Championships

Next
Next

Johnson, Craig book tickets into A semi final at 2016 Canadian Direct Insurance Championships